G-0ZBBP4213E
Portfolio · Full Aircraft Cabin Setup

From empty cabinto operational readiness.

Discuss your aircraft →

Delivered is not the same as ready.

A newly delivered, refurbished, or reconfigured aircraft leaves the completion center structurally complete — but an empty cabin is not a mission-ready one. EDAERO coordinates the physical cabin and galley setup — assessment through handover — so the aircraft is genuinely operational, not just delivered.

Project Portfolio

The aircraft
we prepare.

Aircraft Cabin Setup Portfolio — EDAERO private aviation
New Delivery

Newly Delivered Aircraft

Aircraft arriving from the manufacturer or completion center with an unequipped or partially equipped cabin and galley — set up from empty cabin to operational readiness.

Aircraft Cabin Setup Portfolio — EDAERO private aviation
Refurbishment

Refurbished Aircraft

Aircraft returning from cabin refurbishment or interior refresh, requiring a full re-setup of cabin and galley operations before re-entering service.

Aircraft Cabin Setup Portfolio — EDAERO private aviation
Reconfiguration

Reconfigured Cabins

Aircraft returning from a layout reconfiguration — galley, cabin service items and inventory re-planned around the new layout.

Aircraft Cabin Setup Portfolio — EDAERO private aviation
Owners & Operators

Owner-Preference Setups

Cabins set up to an owner's specific preferences and standards, or brought into an operator's fleet standard before the first mission.

Every aircraft. One standard of readiness.

How Every Project Runs

Nine steps.
Empty cabin to handover.

01

Initial Assessment

Aircraft, cabin configuration and current state reviewed.

02

Owner/Operator Requirements

Preferences, standards and mission profile captured.

03

Cabin & Galley Setup Plan

Layout, equipment and service inventory planned.

04

Sourcing & Procurement

Equipment, galley items and inventory sourced.

05

Physical Aircraft Setup

Cabin and galley physically set up and organized.

06

Inventory & Par Levels

Stock established for ongoing operations.

07

Owner Preference Integration

Setup adjusted to the owner's preferences.

08

Final Cabin Readiness Check

Readiness confirmed for operational use.

09

Handover

Cabin handed over, ready for crew.

Operational cabin provisioning, organization and readiness only — not interior design and not aircraft maintenance. Maintenance, structural, avionics and engineering work remains with the aircraft's maintenance provider. Target timeframe 24–72 hours depending on scope; not a guaranteed delivery time.

Elena A. Dragomir
Led by the Founder

Elena A. Dragomir

Founder & CEO, EDAERO
15+ years in aviationPrivate & commercial operationsFAA Part 91 & 135 · EASA · GCAA environmentsCabin excellence & crew systems

Speak directly with Elena about your aircraft, its configuration and the setup it needs.

← Back to the ten capabilities